Meaning
Marine calculation techniques used to determine the weight of bulk cargo loaded onto or discharged from a vessel analyze the displacement of water before and after the operation. Conducting a draft survey requires measuring the ship’s draft at specific points along the hull. This method establishes cargo weight when direct weighing is impossible.
Displacement Measurement
Calculations are based on Archimedes’ principle of buoyancy, which states that the weight of the displaced water equals the weight of the floating vessel. When a draft survey is performed, surveyors measure the water density and the vessel’s draft at six standard points. These readings allow the calculation of the total displacement of the vessel.
Operational Procedure
Independent surveyors must carefully execute each step of the measurement process to ensure accuracy. The draft survey involves reading the draft marks, measuring the ballast water volume, and checking the fuel oil remaining on board. This process requires stable water conditions to prevent reading errors.
Surveyors must also account for any changes in the ship’s stores and calculate the constant of the vessel to ensure that the final cargo weight is correct.
Commercial Risk
Measurement inaccuracies of even a few centimeters can lead to discrepancies of several hundred tonnes in the recorded weight. When a draft survey is inaccurate, it can cause disputes between buyers and sellers regarding the actual quantity of bulk material delivered. These disputes often lead to prolonged legal arbitration and financial losses.